TCE’s may include driveways or side yards to connect the work area to Vendola Drive for equipment and material access purposes. These temporary access areas might be located every 5 or so houses depending on the location along the project and ease of access to the levee. The access needs will be identified and negotiated where there is access with minimal obstruction/disruption. In some cases there might not be room for the kind of equipment that was used during construction of the prototype such as a mini excavator and skid steer and the cost of creating that room for access is deemed too expensive and/or disruptive in certain locations. In these cases the contractor may have to complete the construction by hand, as with the previous installation methods, or if feasible, traverse the levee a further distance from a less disruptive access point.