News

Category
Conservation Corps crew member conducting creek maintenance

Flood Zone 4 Maintenance Update, Summer 2022

Posted on September 7, 2022

The Marin County Flood Control and Water Conservation District conducts regular maintenance activities throughout the year in each of the diverse Flood Control Zones in Marin. The various forms of maintenance work, whether it is for flood mitigation infrastructure or targeted vegetation control, is a critical part a flood risk reduction for each respective community....
rebuilt timber reinforced berm

New Design Phase Planned for Levee Project

Posted on July 7, 2022

At its July 12 public session, the Marin County Flood Control and Water Conservation District Board of Supervisors will consider awarding a $617,549 contract for engineering design services to develop a design for the Santa Venetia Levee Upgrade Project along Gallinas Creek. The project was put on pause in March 2022 following a cost estimate...
Marin City Drainage Study Aerial Photo

Marin City comprehensive watershed and flood mitigation plan update, June 2022

Posted on June 27, 2022

The Marin County Flood Control and Water Conservation (District) has been working since October 2020 to seek feedback on a comprehensive stormwater planning scope to identify flooding areas and recommend improvements. We have been working with a Flood Zone 3 Advisory Board Subcommittee to get feedback on a comprehensive stormwater planning scope that builds on...
Flood Logo Horizontal 01

Corte Madera Creek Flood Risk Management Project update, March 2022

Posted on March 16, 2022

On March 15, 2022 the Board approved the construction plans and authorized bidding to begin for the first portion of the Corte Madera Creek Flood Risk Management Project. This includes the new stormwater pump station and new vehicular maintenance access ramp in the Granton Park neighborhood. The plans and specifications are available to view through...
Flood Logo Horizontal 01

Eminent domain hearing canceled for levee project

Posted on March 1, 2022

Flood Control District is pausing Santa Venetia project to evaluate cost increase The Marin County Flood Control and Water Conservation District has canceled its March 15 District Board of Supervisors meeting at which the use of eminent domain would have been considered as part of upgrading the levee system along Gallinas Creek. Newly revised cost estimates for...
map for Marin City flood gage

New street-level flood gauge in Marin City

Posted on December 20, 2021

A new flood gauge has been installed under the street at Drake/Donahue intersection in Marin City. You can now view near real-time data for the area. There is a single threshold horizontal line of 59 inches shown on the graph. If the water goes over that threshold this means the storm drainage system is backed...
Portion of pilot project showing what the completed project could look like.

Funding secured for Santa Venetia Levee System

Posted on August 24, 2021

Thanks to newly identified funding, a crucial Marin County Flood Control and Water Conservation District project in the Santa Venetia neighborhood will soon move forward. The $6 million flood mitigation project will improve the levee system along Gallinas Creek, helping to protect the neighborhood from 100-year water surface elevation on the San Pablo Bay. The Flood...
partially excavated basin near Fairfax

Final phase of stormwater basin to begin in Fairfax

Posted on August 6, 2021

The final phase of the Marin County Flood Control and Water Conservation District’s Sunnyside Flood Detention Basin project is expected to begin in August 2021 with a goal of improving public safety for properties along Fairfax Creek and San Anselmo Creek in the upper Ross Valley. The Flood Control District Board of Supervisors will consider...
Novato Creek time lapse video screenshot

Novato Creek maintenance projects update, August 2021

Posted on August 6, 2021

The summer work program includes trimming vegetation and removing debris from watershed creeks and tributaries. This time-lapse movie shows crews removing a huge, fallen tree in Novato Creek. When storm season rolls around, the water will be able to flow safely through the cleared channel. All pumps, motors, and pump stations will be inspected. Every...
Zone 9 Storm Drainage Fee Update

Marin County Board adopts 2021-22 Zone 9 Storm Drainage Fee Update Report

Posted on July 13, 2021

At the July 27, 2021 Flood Control & Water Conservation District Board of Supervisors meeting, the Board adopted the 2021-22 Zone 9 Storm Drainage Fee Update Report. Resources July 27, 2021 meeting details 2021-22 Zone 9 Storm Drainage Fee Update Report
Sunnyside basin during construction phase

Final Phase of Stormwater Basin to Begin

Posted on July 12, 2021

Development part of larger flood mitigation and public safety project near Fairfax The final phase of the Marin County Flood Control and Water Conservation District’s Sunnyside Flood Detention Basin project is expected to begin in August with a goal of improving public safety for properties along Fairfax Creek and San Anselmo Creek in the upper Ross...
Flood Logo Horizontal 01

Corte Madera Creek Flood Risk Management Project update, June 2021

Posted on June 1, 2021

In response to public comments on the draft environmental impact report, including a Town of Ross survey and letter from the Town of Ross indicating strong local preference for Alternative 1, the District staff will recommend adoption of Alternative 1 instead of the proposed project. Alternative 1 will not include modifications to Frederick Allen Park....
the timber-reinforced berm along Gallinas Creek

Next steps considered for Santa Venetia project

Posted on March 16, 2021

Tax measure fails; County to try to preserve federal funding and provide further flood protection efforts. With the recent failure of a neighborhood tax measure to fund enhanced flood protection, flood control engineers are assessing next steps to help protect against catastrophic property losses in the unincorporated Santa Venetia area of eastern San Rafael. Measure...
Flood Logo Horizontal 01

Zone 1 budget approved for fiscal year 2021-22

Posted on February 5, 2021

The proposed baseline budget for Flood Zone 1 for fiscal year 2021-22 was reviewed by the advisory board at the February 4, 2021 advisory board meeting. The new fiscal year begins on July 1, 2021. Resources Proposed baseline budget Budget details
Logo for Marin County Flood Control and Water Conservation District

Zone 1 budget proposed for fiscal year 2021-22

Posted on January 28, 2021

A baseline budget for fiscal year 2021-22 has been proposed for Flood Zone 1: Novato. The fiscal year 2021-22 begins on July 1, 2021. The advisory board reviewed the budget at the February 4, 2021 advisory board meeting. Resources Fiscal year 2021-22 proposed budget Budget line-item details
excavation work in a basin

Flood mitigation project milestone and delay

Posted on January 20, 2021

Final phase of stormwater basin moving forward despite bridge project issue The Marin County Flood Control and Water Conservation District is wrapping up plans for the final phase of the Sunnyside Stormwater Detention Basin and the project is expected to open for contractor bids this summer. The basin, located at 3000 Sir Francis Drake Boulevard...
wetland with hills behind

Deer Island Basin Complex Tidal Wetlands Restoration Project update for 2020

Posted on December 31, 2020

The SF Bay Restoration Authority (SFBRA) Governing Board approved funding for: Design Preparation of construction plans and specifications Permitting for the first phase Following a solicitation for proposals, competitive selection, and negotiation, the cost for the proposed scope exceeded available budget. We worked with SFBRA to modify scale back the design for the Deer Island...
demolition activity

San Anselmo Flood Risk Reduction Project update, November 2020

Posted on November 1, 2020

The first part of the Sunnyside Detention Basin construction was completed ahead of schedule in mid-November. Work included demolition of all the existing buildings and structures, stripping and stockpiling gravel and topsoil to be re-used at the site, and excavation and off-haul of approximately 20,000 cubic yards of earth. The site was covered with mulch...
Flood Logo Horizontal 01

Zone 4 newsletter, September 2020

Posted on September 23, 2020

Flood operations and maintenance The Marin County Flood Control and Water Conservation District (District) staff is sharing this Flood Operations and Maintenance Update for Flood Zone 4 in Tiburon. While the COVID-19 pandemic has impacted our work force at the County generally due to Disaster Service work assignments, essential maintenance of Zone 4 facilities continues....
Flood Logo Horizontal 01

California Office of Management and Budget – A87

Posted on September 7, 2020

“A87 Costs” Explained The Marin County Flood Control & Water Conservation District is a separate and distinct political subdivision of the State of California and receives no revenue from the County. However, the County provides the staffing, financial and administrative support and other services to the District to allow it to function. In addition, the...
Close window