Category: Marin City Pond Flood Reduction Project

Draft Initial Study Posted for Marin City Pond Pump Station Flood Reduction Project

The Marin County Flood Control District has completed a Draft Initial Study/Mitigated Negative Declaration for the Marin City Pond Pump Station Flood Reduction Project. The Draft Initial Study/Mitigated Negative Declaration is available on the County’s website. The 30-day public comment period for the Marin City Pond Pump Station Flood Reduction Project’s Draft Initial Study/Mitigated Negative Declaration began … Continued

About the Marin City Portable Pump Station

In fall 2024, the Marin County Flood Control and Water Conservation District completed the infrastructure for a portable pump station at Drake Avenue and Donahue Street in Marin City, near the Highway 101 ramps.  These pumps are used during high tide events that occur at the same time as rainstorms to help reduce flooding at … Continued

Portable Pump Station to be Installed in Marin City

For Immediate Release – Marin City, CA – The effort is designed to reduce flooding on Donahue Street and Highway 101 ramps The Marin County Flood Control and Water Conservation District has awarded a $1.37 million construction contract for the underground components of a portable pump station in Marin City. The underground work is expected to … Continued

Close window